Nicholas Construction – General Engineering Contractors
Skip to content
  • Projects
  • Company Profile
    • About Us
    • Company History
    • Letters of Reference
    • Management Team
  • Insurance and Safety
  • Experience
    • Experience as Contractors
    • Statement of Contracts
  • Contact
  • Reference SOQ

Projects

Satisfied Clients

Clients
Past/Present Owners

Arvin-Edison Water Storage District
California Dept. of Water Resources
Antelope Valley/East Kern Water District
Kern County Water Agency
Vaughn Water Company
East Niles Community Services District
Rosedale Rio-Bravo Water Storage District
Buena Vista Water Storage District
Belridge Water Storage District
Berrenda Mesa Water Storage District
Semitropic Water Storage District
Friant Water Authority
Ventura County Water Works
Tejon-Castac Water District
Kern-Tulare Water District
North Kern Water Storage District

Engineering Firms
Past/Present Engineering Firms

Provost & Pritchard
AECOM
GEI-Bookman Edmunston Division
Carollo Engineers
Dee Jaspar & Associates
Kennedy-Jenks Consultants
CA. Dept. of Water Resources
Nolte/Vertical 5
Quad-Knopf
RBF Consulting
MWH Water
California Dept. of Water Resources
Bureau of Reclamation

 

Add your company to our growing
list of satisfied clients.

Significant Projects

Cross Valley Canal/Calloway Canal Intertie Project-BNSF Railway Crossing

North Kern Water Storage District, Bakersfield, CA | 2015

Double-Barrel 120” RCP tunnel underneath BNSF railroad. Job included installation of the pipe by a open-faced tunnel boring machine, soil stabilization program, track movement monitoring program, crossing high-pressure gas transmission mains and installation of a 25-foot deep beam and plate shoring system.

Previous Next

Eastside Water Banking Facility

Antelope Valley-East Kern Water Agency-Littlerock, CA | 2015

Construction of water banking ponds, 4ea. vertical turbine deep wells, welded steel water storage tank, chemical injection system, and booster pump station complete with electrical and instrumentation.

Previous Next

Delta Mendota Canal/Los Banos Creek Intertie

Central California Irrigation District-Los Banos, CA | 2017

Installation of three water control structures with aluminum slide gates, steel cofferdam designed and installed by NCI, and approx. 300 LF of precast box culvert.

Previous Next

48” Transmission Pipeline

Antelope Valley-East Kern Water Agency | 2012

Installation of over 39,000 LF of 48-inch cement lined and mortar coated welded steel pipe. Three miles of the project was in the street.

Previous Next

Northern Area Pipeline

Buena Vista Water Storage District | 2016

Installation of over 63,000 LF of 54-inch diameter HDPE pipeline including air/vac valves, and farmer turnouts. Job included a crossing of Interstate 5 and dealing with groundwater issues.

Previous Next

Navigation

  • Home page
  • Projects
  • Company Profile
  • Insurance and Safety
  • Experience
  • Contact
  • Reference SOQ

Contact

661.391.8800 Phone
661.391.8900 Fax
Email Us

251 Carsen Way
Shafter, CA 93263

Contractor’s License: 843461

Affiliates

We are available for emergency work 24 hours a day.
©2022 Nicholas Construction, Inc. All Rights Reserved. Website development & hosting by The Marcom Group