NICHOLAS CONSTRUCTION INCORPORATED

(2007-PRESENT)

PROJECT, OWNER AND DESCRIPTION CONTRACT, AMOUNT

 

SUPERIOR WELL-FIELD PIPELINES for ROSEDALE RIO-BRAVO WATER STORAGE-2016
Installation of over 12,000LF of PVC well-field connector pipelines ranging in size from 15-36 inches.
$822,807
Bakersfield, CA

NORTHERN AREA PIPELINE for BUENA VISTA WATER STORAGE DISTRICT-2015
63,000-LF of 54” and 42” HDPE pipe, farmer turnouts, freeway crossing, air/vacs, manways.
$20,019,456
Buttonwillow, CA

EASTSIDE WATER BANKING FACILITIES for ANTELOPE VALLEY-EAST KERN WATER-2015
40-acres of water settling ponds with concrete lining, 4ea. vertical turbine well sites, vertical turbine booster station, welded steel tank reservoir, chlorine injection system, electrical and instrumentation.
$8,338,296
Pearblossom, CA

WELL RECOVERY PIPELINES for ANTELOPE VALLEY-EAST KERN WATER-2013
Install approx. 18,000-LF of 30” down to 8” steel water transmission pipeline connecting water well sites together for transmission to 4MG steel reservoir.
$3,027,555
Neenach, CA

TRANSMISSION PIPELINE for ANTELOPE VALLEY-EAST KERN WATER-2012
Install approx. 30,000-LF of 48” steel water transmission pipeline, turnouts, tie-ins, air/vacs, manways, traffic control, road reconstruction.
$8,898,281
Neenach, CA

10th STREET PIPELINE AND TURNOUTS for ANTELOPE VALLEY-EAST KERN WATER-2011
Installation of 6,500-LF of 30” steel pipeline, two pressure reducing turnout facilities with block buildings, road reconstruction, traffic control, electrical and instrumentation.
$3,685,041
Lancaster, CA

BEAR TRAP TURNOUT STRUCTURE for DWR-2011
Shutdown of the world famous Edmunston Pumping Plant, install 2,500-LF of steel pipeline, 30-foot deep concrete valve vault construction, ultra-sonic meter installation and vault, solar power system, integration into DWR communication system, electrical and instrumentation.
$2,767,699
Lebec, CA

CENTRAL COAST AQUADUCT ENCASEMENT for DWR-2011
Excavation of 65” steel pipeline, depths to 20’, formed and poured concrete encasement for future HWY 46 widening project. Concrete could not be more than 70-degree F.
$1,779,754
Blackwells Corner, CA

WELL NO.4 FILTRATION for VENTURA COUNTY WATERWORKS-2009
300-hp vertical turbine pump and motor, 125-hp vertical turbine booster system, iron-manganese treatment vessels, chlorine injections system, backwash system, electrical and instrumentation.
$1,798,361
Moorpark, CA

PALMDALE DITCH ENCLOSURE for PALMDALE WATER AGENCY-2009
Approx. 6,500-LF of 48” reinforced concrete pipe, manholes, meter structure, 50,000-cy of import cover material.
$1,945,125
Palmdale, CA

FRIANT KERN CANAL/ARVIN EDISON CANAL INTERTIE for KERN CO WATER AGENCY-2008
Construct 72” double-barrel turnout structure with canal gates, 72“x96” junction structure, ultrasonic meter vault, and approx. 900-LF of 96” reinforced concrete pipe.
$3,106,030
Bakersfield, CA

EAST PIPELINE for KERN CO WATER AGENCY-2008
Approx. 5,500-LF of 30” cement mortar lined and coated steel pipe, tie-ins, road reconstruction, traffic control.
$1,314,966
Bakersfield, CA

WILLOW POND TREATMENT FACILITY for VAUGHN WATER COMPANY-2008
600-hp vertical turbine pump and motor, oxygen scrubber injection system, chlorine injection system, 4ea. granulated activated carbon filter vessels, site work, electrical and instrumentation.
$1,052,559
Bakersfield, CA

ALLEN RD. SEWER PROJECT for CITY OF BAKERSFIELD-2007
Approx. 12,000LF of 18” and 24” PVC Sewer Transmission Pipeline, five auger bores, lift-station reconstruction, sandy conditions, traffic control, and paving.
$2,366,633
Bakersfield, CA

SEWER EFFLUENT DELIVERY PIPELINE for CITY OF PORTERVILLE-2007
Approx. 11,000LF of 24” PVC Sewer Transmission Pipeline, 40-acres of settling ponds, concrete distribution structures, farmer turnouts.
$1,362,327
Porterville, CA

CONCRETE CULVERT IMPROVEMENTS for VENTURA COUNTY-2007
Concrete Box Culvert, active stream and storm channel, road reconstruction, traffic control, extensive dewatering.
$1,540,798
Thousand Oaks, CA

CROSS VALLEY CANAL/CALLOWAY CANAL INTERTIE for NORTH KERN WSD
Double-barrel 120” RCP tunnel underneath the BNSF railroad, track monitoring program, soil stabilization program, beam and plate shoring and lagging, high pressure gas line crossings, canal lining.
$3,942,320
Bakersfield, CA