nicholas construction engineering logo bakersfield california
slogan

homesite mapcontact us

main image for work in progress
Contact Information
Nicholas Construction
1975 Airport Dr.
Bakersfield, CA 93308

Phone: 661.391.8800
Fax: 661.391.8900
Email: click here
Client List
City of Bakersfield
City of Tehachapi
Los Angeles County
Lamont Public Utilities District
City of Shafter
Department of the Interior
Kern County
Victor Valley Water District
Nevada Irrigation District
Fresno County
Town of Apple Valley

To see a full list of our past and present clients as well as information about Nicholas Construction click here.

 
Work in Progress
Sheep Creek Water Storage Tank
 

Overview: 

Owner: National Park Service

We were contracted to demo an existing 155,000 gallon tank, construct a new 165,000 gallon glass lined tank, and perform the integration into their existing system. The project was located in Kings Canyon National Park and there is no telephone service of any kind. The crews lodged in the campground while the weather was good but had to evacuate immediately with the threat of snow. The road could not be accessed by emergency equipment during inclement weather. We constructed the tank last fall and will complete the SCADA system and telemetry this spring.

Value:

$573,000.00

Completion:

May 2006

Images:




Bajo Agua Storm Drain Project

Overview: 

Owner: City of Camarillo
The City of Camarillo awarded us a project to construct a 1,200 foot long box culvert near the Camarillo airport extending from West Ventura Blvd. to the Camarillo Hills Drain. The major challenge was dewatering and disposal of the groundwater.

Value:

$1,537,000

Completion:

N/A

Images:




Stallion Springs Tank #6B

Overview: 

Owner: Stallion Springs Community Services District

Engineer: Quad Knopf, Bakersfield

We are constructing a .75MG Tank in Stallion Springs to meet their water needs as development continues. The challenge of the project is the 8,000 cubic yard excavation that will require us to blast the rocky places.

Value:

$930,000

Completion:

N/A

Images:

N/A

Victor Valley Water District-Eva Del and Hesperia Rd. Pipeline

Overview: 

Project consisted of installing a new water main in the town of Victorville to meet the new capacities of rapid growth. Obstacles include heavy traffic control and sandy conditions.

Value:

$815,000

Completion:

July 2005

Images:

N/A

Buena-Vista Water Storage District-Flow Control Facilities

Overview: 

To build three, large diameter water control structures with canal gates. Our challenge was to meet strict dates the district wanted to bank surplus water during the extremely wet year.

Value:

$580,000

Completion:

June 2005

Images:




City of Tehachapi-Curry St. Waterline

Overview: 

Tehachapi is growing rapidly and water is becoming a shortage. We were contracted in install 2,000LF of 16” water line and tie into two existing wells and a 650,000 gallon welded steel tank.

Value:

$350,000

Completion:

July 2005

Images:


Sulpher Springs School District-Mint Canyon Sewer

Overview: 

Nicholas Construction was contracted to install about 3300LF of 18” clay pipe in Sierra Hwy in the town of Canyon Country, near Santa Clarita.

Value:

$900,000

Completion:

October 2005

Images:

N/A

 