nicholas construction engineering logo past projects
slogan

homesite mapcontact us

main image for past projects
Contact Information
Nicholas Construction
1975 Airport Dr.
Bakersfield, CA 93308

Phone: 661.391.8800
Fax: 661.391.8900
Email: click here
Client List
City of Bakersfield
City of Tehachapi
Los Angeles County
Lamont Public Utilities District
City of Shafter
Department of the Interior
Kern County
Victor Valley Water District
Nevada Irrigation District
Fresno County
Town of Apple Valley

To see a full list of our past and present clients as well as information about Nicholas Construction click here.

 
Past Projects
Mint Canyon Elementary Sewer
 

Overview: 

Owner: Sulpher Springs School District, Canyon Country, CA.

Cornerstone Engineering of Bakersfield brought this project to us for Sulpher Springs School District because they could not find a local contractor to complete the sewer installation before the August 1st. Deadline to open the new school. The project was extremely intense due to depth and traffic control in Sierra Hwy. Susan Ahan, the project manager of the PSWC Group located in Moorpark was one of the best we have ever worked for.

Value:

$973,000

Images:




South Tahoe Public Utility District-Hwy 50 Waterline 

Overview: 

In the summer of 2004, we were contracted to install about 6,000 LF of 14” water transmission line that included three bores across a very busy HWY 50 in downtown South Lake Tahoe. The biggest challenge was the project was done ALL AT NIGHT!!

Value:

$1.4M

Images:



Nevada Irrigation District-Banner Taylor Reservoir Pipeline

Overview: 

Also in the summer of 2004, we installed about 6,200LF of 24” ductile iron pipe through neighborhoods, steep terrain and rock. The challenge was keeping the neighbors pleased while trenching through a hard lava cap we encountered in the last 1,000 feet of pipe lay. We had to mobilize a 100,000 pound rock trencher to excavate due to the lack of room for an excavator.

Value:

$853,000

Images:



City of Tehachapi-Tucker Rd. Sewer

Overview: 

In the summer/fall of 2003 we installed about 5,000Lf of 18” clay pipe in excess of 18 feet deep. We also installed a 35 foot lift station and force main to the sewage treatment plant.

Value:

$1.3M

Images:

N/A


 